Concrete quality control - field note 064
#Concrete Quality Control during a 3-Month Pour
During the 3‑month concrete pour for the 1200 m³ block in Pune, ConcretePro supplied ready‑mix concrete with a slump of 20 cm.
The on‑site QC team ran 12 slump tests per batch, maintaining a variance below 5 %.
Lesson learned: Consistent batching schedules prevent cold joints.
- Pre‑mix batch checks.
- Monitor temperature with data loggers.
- Adjust mix design on‑site.
- Communicate changes to the crew.