Concrete quality control - field note 064

by Aditya Kulkarni

#Concrete Quality Control during a 3-Month Pour

During the 3‑month concrete pour for the 1200 m³ block in Pune, ConcretePro supplied ready‑mix concrete with a slump of 20 cm.

The on‑site QC team ran 12 slump tests per batch, maintaining a variance below 5 %.

Lesson learned: Consistent batching schedules prevent cold joints.

  • Pre‑mix batch checks.
  • Monitor temperature with data loggers.
  • Adjust mix design on‑site.
  • Communicate changes to the crew.