Site logistics optimization - field note 046
#Optimizing Site Logistics with Staggered Loader Shifts
In Hyderabad, we cleared 500 m³ of earth for the new data centre. Implementing staggered shift loading on the 8‑t loaders reduced idle time by 18%. The schedule was tightened from 12 to 9 days.
- Plan loader routes in advance.
- Use real‑time GPS to avoid congestion.
- Rotate crews to maintain momentum.
- Sync with vendor dispatch for spare units.