Green building implementation - field note 039

by Ayaan Patel

#Modular Solar Array Installation Accelerates Green Building Goals

The 50 kWp solar array on the Bangalore Smart Mall roof was installed using a modular mounting system that reduced labor hours by 25%.

  • Pre‑fabricate mounting brackets; - Use standardized cable trays; - Conduct joint safety checks; - Install panels in 4‑hour shifts.

SolarTech India’s system achieved a 97% panel efficiency after 12 months of operation, meeting the LEED Gold criteria.