0 0
Question

Concrete quality control - field note 007

by Arjun Patel

In Bengaluru’s high‑rise office complex, we adopted a real‑time slump meter from CEMCON India to monitor 50,000 m³ of concrete deliveries.

  • Calibrate meter before each batch.
  • Record slump readings in the dispatch log.
  • Compare against design specification ±15 mm.
  • Re‑mix batches that fall outside tolerance.

The CEMCON 42.5 system cut rejected pours by 24% and helped maintain the 14‑day compressive strength target.

0 comments

Comments

No comments yet. Be the first in the app.