0
0
Achievement
Steel reinforcement detailing - field note 008
by Neha Reddy
During the Delhi municipal bridge project, we leveraged SteelLink’s 3D CAD detailing to manage 200 tonnes of rebar across 30 span sections.
- Verify bar spacing against load calculations.
- Align sleeve placements with slab openings.
- Export clash reports to BIM model.
- Adjust reinforcement layout before on‑site cutting.
The 3D CAD approach decreased on‑site rebar clashes by 41% and saved 18 man‑days of re‑work.
Comments
No comments yet. Be the first in the app.