0 0
Insight

Steel reinforcement detailing - field note 035

by Aditya Kumar

#BIM‑Driven Rebar Detailing: 18% Time Savings in an Ahmedabad High‑Rise Tower

The new high‑rise office tower in Ahmedabad required 1200 tonnes of rebar, and our detailing team leveraged 3D BIM to pre‑check all layouts against the structural drawings.

  • Export rebar schedules to BIM; - Perform clash detection with concrete volumes; - Verify bend tolerances at the shop; - Use laser scanning on the site to confirm placement.

The process cut rebar installation time by 18% and earned us a commendation from the project manager. SteelLink Fabrications played a key role in this success.

0 comments

Comments

No comments yet. Be the first in the app.