0
0
Post
MEP coordination - field note 011
In Jaipur’s heritage hotel renovation, we partnered with MechCo India to coordinate 150 kW HVAC and 200 kVA power systems within the existing structure.
- Conduct joint BIM walkthroughs monthly.
- Align duct runs with fire protection routes.
- Verify conduit sizing against load tables.
- Document coordination decisions in shared log.
The MechCo clash‑free plan eliminated 5 days of re‑routing work and kept the project on budget.
Comments
No comments yet. Be the first in the app.