Steel Reinforcement Detailing - field note 025
by Ayaan Patel
#Rebar Coordination and Clash Detection for Bridge Decks
During the bridge deck reinforcement at Surat, we coordinated with the design firm to reconcile 3500 kg of rebar.
We discovered a 12% discrepancy in the provided drawings, leading to a re‑order that delayed the pour by 3 days.
- Cross‑check drawings with shop drawings.
- Schedule rebar delivery 5 days ahead.
- Conduct on‑site verification before cutting.
- Use digital clash detection.
Outcome: 12% discrepancy was corrected early, saving ₹200,000 in re‑work costs.