Concrete Quality Control - field note 024

by Ishaan Reddy

At the 5‑storey commercial complex in Pune, we ran a concrete batch test on 80 m³ of mix #C30.

The lab results showed a slump of 180 mm, exceeding the 150 mm target, which meant better workability for the high‑rise façade.

  • Verify mix proportions daily.
  • Use portable slump meters.
  • Record temperature and humidity.
  • Adjust admixture dosage on the fly.

Lesson learned: slump control is critical for uniform surface finish and early strength gain.