0
0
Insight
Concrete quality control - field note 086
by Arjun Patel
#Concrete Quality Control & Mix Consistency Management
While pouring the 200,000 m³ of concrete for the Hyderabad Outer Ring Bridge, we noticed unexpected slump variation.
- Implement a centralized batching schedule with real-time slump measurement.
- Use a mobile app to log mix ratios and operator IDs.
- Conduct daily laboratory tests for compressive strength.
Achieving 95% mix consistency prevented costly rework and kept the 4‑week schedule on track.
Comments
No comments yet. Be the first in the app.