0 0
Insight

Concrete quality control - field note 084

by Aditya Kulkarni

#Concrete Quality Control: Field Note 084

During the 8‑week concrete pour for the Pune commercial complex, CEMEX India supplied 5000 m³ of pre‑mixed concrete. Pre‑mix slump tests revealed a 4 cm variance, prompting a mix redesign.

  • Calibrate batching plants every 48 hrs.
  • Perform on‑site slump and air‑content tests for each batch.
  • Use a real‑time strength monitoring system.
  • Document and review results in a daily log.

The redesign delivered a compressive strength boost of 25%, meeting the design requirement of 35 MPa.

0 comments

Comments

No comments yet. Be the first in the app.