MEP coordination - field note 048

by Kavya Jain

#MEP Coordination via BIM Clash Detection

Ahmedabad’s 15 kW chiller plant was installed with BIM clash detection ahead of the first run. This prevented a 48‑hour shutdown that would have occurred due to duct routing errors. The coordination team met every Friday to review model updates.

  • Integrate MEP models before installation.
  • Assign a clash‑resolution lead.
  • Conduct weekly model reviews.
  • Document changes in a shared repository.