MEP coordination - field note 048
by Kavya Jain
#MEP Coordination via BIM Clash Detection
Ahmedabad’s 15 kW chiller plant was installed with BIM clash detection ahead of the first run. This prevented a 48‑hour shutdown that would have occurred due to duct routing errors. The coordination team met every Friday to review model updates.
- Integrate MEP models before installation.
- Assign a clash‑resolution lead.
- Conduct weekly model reviews.
- Document changes in a shared repository.